Internal Materials Transfer using Misc Received Note


Shivprasad Wangdare

2022-02-15 18:24:40


If we are updating inventory using MRN form and using the same MRN to transfer the materials from that site to another site, then the MRN number which is generated while creating the first MRN will remain the same throughout all the entries where it will get linked 

for example 

AB01/SH1/MRN/2022/0002 this MRN is generated in the project - Strategy Heights to update godown stock, (image 1)

Later the same MRN is used to transfer the materials from the Strategy Heights project to the Samdariya Gold project in AB01/SH1/GIN/2022/00005 this GIN (image 2)

AB01/SG01/MRN/2022/0001 this MRN has been generated in the above process but in MRN number in Dlist it will show AB01/SH1/MRN/2022/0002 this MRN only and in stock posting also it will be mapped (image 3)

whenever we will use AB01/SG01/MRN/2022/0001 this MRN for processing in Samdariya Gold project AB01/SH1/MRN/2022/0002 this number will be shown in MRN number in list fields and also will get same reflected in the Stock report (image 4)



Image 1 

 

Image 2 



Image 3 



Image 4